TAP153093

Substation

North Carolina · GEORGIA POWER CO

Max voltage
230
kV

TAP153093 is an electric transmission substation in North Carolina, operated by GEORGIA POWER CO. It is classified as high-voltage (230 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines3

Ownership & operation

OperatorGEORGIA POWER CO
Coordinates33.9756, -83.3746

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#15442230 kVGEORGIA POWER COIN SERVICE0.9 mi
#34709230 kVGEORGIA POWER COIN SERVICE2.4 mi
#36419230 kVGEORGIA POWER COIN SERVICE5.4 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP153093, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP153093 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
MPC GENERATINGSubstation-AdjacentGAWalton County230 kV300 MW5.8 yrs75.7
W R Clayton PlantBrownfieldGAWalton513 MW75.6
EAST SOCIAL CIRCLESubstation-AdjacentGAWalton County230 kV300 MW5.8 yrs71.4
UNKNOWN156831Substation-AdjacentGANewton County115 kV100 MW5.8 yrs70.8
UNKNOWN116143Substation-AdjacentGANewton County115 kV100 MW5.8 yrs69.9
UNKNOWN142331Substation-AdjacentGAWalton County230 kV300 MW5.8 yrs69.0
DEADEND169067Substation-AdjacentGAWalton County115 kV100 MW5.8 yrs68.7
UNKNOWN116150Substation-AdjacentGAWalton County115 kV100 MW5.8 yrs68.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.