TAP153087 is an electric transmission substation in North Carolina, operated by GEORGIA POWER CO. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorGEORGIA POWER CO
Coordinates34.3316, -83.4280

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#32375115 kVGEORGIA POWER COIN SERVICE4.6 mi
#46004115 kVGEORGIA POWER COIN SERVICE2.1 mi
#46285115 kVGEORGIA POWER COIN SERVICE12.8 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP153087, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP153087 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN111235Substation-AdjacentGAHall County230 kV300 MW4.3 yrs68.4
WINDERSubstation-AdjacentGABarrow County230 kV300 MW4.3 yrs68.0
UNKNOWN111251Substation-AdjacentGAHart County230 kV300 MW4.3 yrs67.8
UNKNOWN111508Substation-AdjacentGABarrow County230 kV300 MW4.3 yrs67.2
Greenfield (UNKNOWN110410 - SOUTH HALL)GreenfieldGAHall County500 kV1,000 MW4.3 yrs67.0
UNKNOWN133851Substation-AdjacentGABarrow County230 kV300 MW4.3 yrs66.6
UNKNOWN111191Substation-AdjacentGAHall County230 kV300 MW4.3 yrs66.5
UNKNOWN111491Substation-AdjacentGAMadison County230 kV300 MW4.3 yrs66.2

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP153087 substation, North Carolina. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.