TAP152825

Substation

North Carolina · SOUTH CAROLINA ELECTRIC&GAS COMPANY

Max voltage
115
kV

TAP152825 is an electric transmission substation in North Carolina, operated by SOUTH CAROLINA ELECTRIC&GAS COMPANY. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorSOUTH CAROLINA ELECTRIC&GAS COMPANY
Coordinates34.2915, -81.0053

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#2337115 kVIN SERVICE0.1 mi
#34860115 kVIN SERVICE5.9 mi
#51323115 kVSOUTH CAROLINA ELECTRIC&GAS COMPANYIN SERVICE7.9 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP152825, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP152825 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN117533Substation-AdjacentSCRichland County230 kV300 MW4.3 yrs72.1
TAP142264Substation-AdjacentSCRichland County230 kV300 MW4.3 yrs71.2
UNKNOWN117539Substation-AdjacentSCRichland County230 kV300 MW4.3 yrs70.8
DEADEND167376Substation-AdjacentSCFairfield County230 kV300 MW4.3 yrs69.9
COLUMBIA ENERGY CENTER (SC)Substation-AdjacentSCRichland County230 kV300 MW4.3 yrs69.4
UNKNOWN117831Substation-AdjacentSCLexington County230 kV300 MW4.3 yrs69.3
UNKNOWN157677Substation-AdjacentSCRichland County115 kV100 MW4.3 yrs68.8
Rocky CreekBrownfieldSCLancaster28 MW68.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.