TAP152694

Substation

North Carolina · SOUTH CAROLINA ELECTRIC&GAS COMPANY

Max voltage
115
kV

TAP152694 is an electric transmission substation in North Carolina, operated by SOUTH CAROLINA ELECTRIC&GAS COMPANY. It is classified as sub-transmission (115 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines1

Ownership & operation

OperatorSOUTH CAROLINA ELECTRIC&GAS COMPANY
Coordinates34.1904, -80.9680

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#41996115 kVSOUTH CAROLINA ELECTRIC&GAS COMPANYIN SERVICE0.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP152694, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP152694 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
TAP142264Substation-AdjacentSCCalhoun County230 kV300 MW3.7 yrs73.7
UNKNOWN117533Substation-AdjacentSCRichland County230 kV300 MW4.3 yrs72.1
TAP142264Substation-AdjacentSCRichland County230 kV300 MW4.3 yrs71.2
UNKNOWN117539Substation-AdjacentSCRichland County230 kV300 MW4.3 yrs70.8
UNKNOWN120974Substation-AdjacentSCLexington County115 kV100 MW3.7 yrs70.4
DEADEND167376Substation-AdjacentSCFairfield County230 kV300 MW4.3 yrs69.9
COLUMBIA ENERGY CENTER (SC)Substation-AdjacentSCRichland County230 kV300 MW4.3 yrs69.4
UNKNOWN117831Substation-AdjacentSCLexington County230 kV300 MW4.3 yrs69.3

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP152694 substation, North Carolina. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.