TAP152559

Substation

North Carolina

Max voltage
115
kV

TAP152559 is an electric transmission substation in North Carolina. It is classified as sub-transmission (115 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines2

Ownership & operation

Operator not catalogued for this substation.

Coordinates34.2657, -81.3291

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#19783115 kVIN SERVICE0.2 mi
#28998115 kV0.5 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP152559, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP152559 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN117533Substation-AdjacentSCRichland County230 kV300 MW4.3 yrs72.1
UNKNOWN117539Substation-AdjacentSCRichland County230 kV300 MW4.3 yrs70.8
DEADEND167376Substation-AdjacentSCFairfield County230 kV300 MW4.3 yrs69.9
COLUMBIA ENERGY CENTER (SC)Substation-AdjacentSCRichland County230 kV300 MW4.3 yrs69.4
UNKNOWN117831Substation-AdjacentSCLexington County230 kV300 MW4.3 yrs69.3
UNKNOWN157677Substation-AdjacentSCRichland County115 kV100 MW4.3 yrs68.8
UNKNOWN160652Substation-AdjacentSCLexington County115 kV100 MW4.3 yrs68.4
TAP152618Substation-AdjacentSCNewberry County230 kV300 MW4.3 yrs68.2

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP152559 substation, North Carolina. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.