TAP152493

Substation

North Carolina · DUKE ENERGY CAROLINAS, LLC

Max voltage
100
kV

TAP152493 is an electric transmission substation in North Carolina, operated by DUKE ENERGY CAROLINAS, LLC. It is classified as distribution (69–115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage100 kV
Min voltage100 kV
Voltage classDistribution (69–115 kV)
Connected lines3

Ownership & operation

OperatorDUKE ENERGY CAROLINAS, LLC
Coordinates34.7386, -82.8304

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#18997100 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE0.2 mi
#39859100 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE0.1 mi
#58433100 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE9.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP152493, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP152493 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
NORTH GREENVILLE TIESubstation-AdjacentSCGreenville County230 kV300 MW3.7 yrs72.3
JOCASSEE TIESubstation-AdjacentSCPickens County500 kV1,000 MW3.7 yrs70.0
Greenfield (UNKNOWN111199 - JOCASSEE TIE)GreenfieldSCPickens County500 kV1,000 MW3.7 yrs69.7
UNKNOWN110410Substation-AdjacentSCOconee County500 kV1,000 MW4.3 yrs69.6
SHILOH SWITCHING STATIONSubstation-AdjacentSCPickens County230 kV300 MW3.7 yrs69.0
UNKNOWN109779Substation-AdjacentNCJackson County161 kV100 MW3.7 yrs68.7
Greenfield (UNKNOWN111199 - JOCASSEE TIE)GreenfieldSCPickens County500 kV1,000 MW3.7 yrs68.0
HARTWELL LAKESubstation-AdjacentGAHart County230 kV300 MW4.3 yrs67.9

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP152493 substation, North Carolina. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.