TAP152038

Substation

North Carolina · GEORGIA POWER CO

Max voltage
115
kV

TAP152038 is an electric transmission substation in North Carolina, operated by GEORGIA POWER CO. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorGEORGIA POWER CO
Coordinates34.1686, -84.0985

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#20215115 kVGEORGIA POWER COIN SERVICE1.5 mi
#35993115 kVGEORGIA POWER COIN SERVICE3.0 mi
#43010115 kVGEORGIA POWER COIN SERVICE1.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP152038, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP152038 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
BULL SLUICESubstation-AdjacentGACobb County500 kV1,000 MW5.8 yrs78.1
Jack McDonoughBrownfieldGAFulton598 MW77.9
UNKNOWN111545Substation-AdjacentGAFulton County230 kV300 MW5.8 yrs77.0
UNKNOWN111533Substation-AdjacentGAFulton County230 kV300 MW5.8 yrs76.5
UNKNOWN111524Substation-AdjacentGACherokee County230 kV300 MW5.8 yrs76.1
TAP172425Substation-AdjacentGACobb County230 kV300 MW5.8 yrs75.9
UNKNOWN116601Substation-AdjacentGADeKalb County230 kV300 MW5.8 yrs75.8
UNKNOWN111530Substation-AdjacentGAFulton County230 kV300 MW5.8 yrs75.8

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP152038 substation, North Carolina. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.