TAP151882

Substation

North Carolina · PROGRESS ENERGY CAROLINAS INC

Max voltage
230
kV

TAP151882 is an electric transmission substation in North Carolina, operated by PROGRESS ENERGY CAROLINAS INC. It is classified as high-voltage (230 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines3

Ownership & operation

OperatorPROGRESS ENERGY CAROLINAS INC
Coordinates34.3887, -80.1502

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#5526230 kVPROGRESS ENERGY CAROLINAS INCIN SERVICE1.5 mi
#30962230 kVPROGRESS ENERGY CAROLINAS INCIN SERVICE15.8 mi
#44356230 kVPROGRESS ENERGY CAROLINAS INCIN SERVICE0.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP151882, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP151882 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
CAMDENSubstation-AdjacentSCKershaw County230 kV300 MW4.3 yrs69.0
SOCIETY HILLSubstation-AdjacentSCMarlboro County230 kV300 MW4.3 yrs67.9
TAP170187Substation-AdjacentSCLee County230 kV300 MW4.3 yrs67.3
UNKNOWN150888Substation-AdjacentSCDarlington County230 kV300 MW4.3 yrs67.0
UNKNOWN151883Substation-AdjacentSCLee County230 kV300 MW4.3 yrs66.5
Darlington CountyBrownfieldSCDarlington County730 MW3.7 yrs65.8
TAP148313Substation-AdjacentSCMarlboro County230 kV300 MW4.3 yrs65.0
H B RobinsonBrownfieldSCDarlington County223 MW3.7 yrs64.8

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP151882 substation, North Carolina. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.