TAP151806

Substation

North Carolina

Max voltage
230
kV

TAP151806 is an electric transmission substation in North Carolina. It is classified as high-voltage (230 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines3

Ownership & operation

Operator not catalogued for this substation.

Coordinates34.9954, -80.0643

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#33693230 kVIN SERVICE1.6 mi
#35006230 kVIN SERVICE1.7 mi
#45489230 kVIN SERVICE2.6 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP151806, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP151806 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN114385Substation-AdjacentNCRichmond County500 kV1,000 MW4.3 yrs72.2
HAMLET GENERATING FACILITYSubstation-AdjacentNCRichmond County230 kV300 MW4.3 yrs67.0
TAP148313Substation-AdjacentSCMarlboro County230 kV300 MW4.3 yrs65.0
Greenfield (UNKNOWN114385 - NEWPORT TIE)GreenfieldNCAnson County500 kV1,000 MW4.3 yrs65.0
TAP148314Substation-AdjacentSCMarlboro County230 kV300 MW4.3 yrs64.5
CHERAW REID PARKSubstation-AdjacentSCChesterfield County230 kV300 MW4.3 yrs64.5
Greenfield (UNKNOWN114385 - NEWPORT TIE)GreenfieldNCAnson County500 kV1,000 MW4.3 yrs64.4
TAP161602Substation-AdjacentNCAnson County230 kV300 MW4.3 yrs64.4

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP151806 substation, North Carolina. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.