TAP151611

Substation

North Carolina · DUKE ENERGY CAROLINAS, LLC

Max voltage
100
kV

TAP151611 is an electric transmission substation in North Carolina, operated by DUKE ENERGY CAROLINAS, LLC. It is classified as distribution (69–115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage100 kV
Min voltage100 kV
Voltage classDistribution (69–115 kV)
Connected lines3

Ownership & operation

OperatorDUKE ENERGY CAROLINAS, LLC
Coordinates34.1843, -82.1710

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#10161100 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE0.0 mi
#21631100 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE0.1 mi
#49598100 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE1.8 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP151611, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP151611 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
TAP141834Substation-AdjacentSCEdgefield County115 kV100 MW3.7 yrs69.5
UNKNOWN116729Substation-AdjacentSCEdgefield County115 kV100 MW3.7 yrs67.6
Buzzard RoostBrownfieldSCGreenwood15 MW67.0
TAP150472Substation-AdjacentGALincoln County115 kV100 MW3.7 yrs66.8
UNKNOWN113391Substation-AdjacentSCAbbeville County230 kV300 MW4.3 yrs66.2
UNKNOWN112375Substation-AdjacentGALincoln County115 kV100 MW3.7 yrs65.4
JOHN S RAINEYSubstation-AdjacentSCAbbeville County230 kV300 MW4.3 yrs65.3
UNKNOWN113985Substation-AdjacentSCAbbeville County230 kV300 MW4.3 yrs64.9

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP151611 substation, North Carolina. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.