TAP151311

Substation

North Carolina · GEORGIA POWER CO

Max voltage
115
kV

TAP151311 is an electric transmission substation in North Carolina, operated by GEORGIA POWER CO. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorGEORGIA POWER CO
Coordinates33.9410, -84.2049

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#15522115 kVGEORGIA POWER COIN SERVICE0.0 mi
#39830115 kVGEORGIA POWER COIN SERVICE5.5 mi
#41318115 kVGEORGIA POWER COIN SERVICE0.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP151311, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP151311 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
BIG SHANTYSubstation-AdjacentGACobb County500 kV1,000 MW5.8 yrs79.9
UNIONSubstation-AdjacentGAClayton County500 kV1,000 MW5.8 yrs79.9
KLONDIKESubstation-AdjacentGARockdale County500 kV1,000 MW5.8 yrs79.8
BULL SLUICESubstation-AdjacentGACobb County500 kV1,000 MW5.8 yrs78.1
Jack McDonoughBrownfieldGAFulton598 MW77.9
UNKNOWN111545Substation-AdjacentGAFulton County230 kV300 MW5.8 yrs77.0
UNKNOWN111355Substation-AdjacentGAFulton County230 kV300 MW5.8 yrs76.8
UNKNOWN111350Substation-AdjacentGAFulton County230 kV300 MW5.8 yrs76.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen