TAP151233

Substation

North Carolina · GEORGIA POWER CO

Max voltage
230
kV

TAP151233 is an electric transmission substation in North Carolina, operated by GEORGIA POWER CO. It is classified as high-voltage (230 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines3

Ownership & operation

OperatorGEORGIA POWER CO
Coordinates34.1638, -83.6435

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#27333230 kVGEORGIA POWER COIN SERVICE1.8 mi
#40880230 kVGEORGIA POWER COIN SERVICE17.7 mi
#42095230 kVGEORGIA POWER COIN SERVICE0.5 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP151233, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP151233 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
MPC GENERATINGSubstation-AdjacentGAWalton County230 kV300 MW5.8 yrs75.7
W R Clayton PlantBrownfieldGAWalton513 MW75.6
UNKNOWN116162Substation-AdjacentGAGwinnett County230 kV300 MW5.8 yrs73.8
SOUTH HALLSubstation-AdjacentGAHall County500 kV1,000 MW4.3 yrs71.6
UNKNOWN116106Substation-AdjacentGAGwinnett County230 kV300 MW4.3 yrs70.9
UNKNOWN116105Substation-AdjacentGAGwinnett County230 kV300 MW4.3 yrs70.3
UNKNOWN116108Substation-AdjacentGAGwinnett County230 kV300 MW4.3 yrs70.1
UNKNOWN116235Substation-AdjacentGAForsyth County230 kV300 MW4.3 yrs69.8

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP151233 substation, North Carolina. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.