TAP151230 is an electric transmission substation in North Carolina, operated by GEORGIA POWER CO. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorGEORGIA POWER CO
Coordinates34.3484, -83.7890

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#8377115 kVGEORGIA POWER COIN SERVICE2.8 mi
#28781115 kVGEORGIA POWER COIN SERVICE0.7 mi
#29457115 kVGEORGIA POWER COIN SERVICE3.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP151230, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP151230 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN111512Substation-AdjacentGAGwinnett County230 kV300 MW4.3 yrs72.0
SOUTH HALLSubstation-AdjacentGAHall County500 kV1,000 MW4.3 yrs71.6
UNKNOWN116232Substation-AdjacentGAGwinnett County230 kV300 MW4.3 yrs71.5
UNKNOWN111513Substation-AdjacentGAGwinnett County230 kV300 MW4.3 yrs71.2
UNKNOWN116106Substation-AdjacentGAGwinnett County230 kV300 MW4.3 yrs70.9
UNKNOWN116105Substation-AdjacentGAGwinnett County230 kV300 MW4.3 yrs70.3
UNKNOWN116108Substation-AdjacentGAGwinnett County230 kV300 MW4.3 yrs70.1
UNKNOWN116235Substation-AdjacentGAForsyth County230 kV300 MW4.3 yrs69.8

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.