TAP150635
SubstationNorth Carolina · DUKE ENERGY CAROLINAS, LLC
TAP150635 is an electric transmission substation in North Carolina, operated by DUKE ENERGY CAROLINAS, LLC. It is classified as distribution (69–115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Ownership & operation
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #22012 | 100 kV | DUKE ENERGY CAROLINAS, LLC | IN SERVICE | 5.0 mi |
| #29205 | 100 kV | DUKE ENERGY CAROLINAS, LLC | IN SERVICE | 0.0 mi |
| #30149 | 100 kV | DUKE ENERGY CAROLINAS, LLC | IN SERVICE | 8.2 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of TAP150635, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| MITCHELL RIVER | Substation-Adjacent | NC | Yadkin County | 230 kV | 300 MW | 4.3 yrs | 67.2 |
| UNKNOWN114916 | Substation-Adjacent | NC | Forsyth County | 230 kV | 300 MW | 4.3 yrs | 66.7 |
| UNKNOWN115091 | Substation-Adjacent | NC | Stokes County | 230 kV | 300 MW | 4.3 yrs | 65.7 |
| Greenfield (UNKNOWN114916 - MARSHALL STEAM) | Greenfield | NC | Davie County | 230 kV | 300 MW | 4.3 yrs | 64.1 |
| UNKNOWN111010 | Substation-Adjacent | NC | Stokes County | 230 kV | 300 MW | 4.3 yrs | 63.8 |
| Greenfield (UNKNOWN114916 - MARSHALL STEAM) | Greenfield | NC | Davie County | 230 kV | 300 MW | 4.3 yrs | 63.6 |
| UNKNOWN115068 | Substation-Adjacent | NC | Davie County | 100 kV | 50 MW | 4.3 yrs | 63.5 |
| Lexington Hickory Street | Brownfield | NC | Davidson | — | 2 MW | — | 63.0 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for TAP150635 substation, North Carolina. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.