TAP150590

Substation

North Carolina · PROGRESS ENERGY CAROLINAS INC

Max voltage
115
kV

TAP150590 is an electric transmission substation in North Carolina, operated by PROGRESS ENERGY CAROLINAS INC. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorPROGRESS ENERGY CAROLINAS INC
Coordinates34.7361, -80.3555

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#32467115 kVPROGRESS ENERGY CAROLINAS INCIN SERVICE7.5 mi
#39891115 kVPROGRESS ENERGY CAROLINAS INCIN SERVICE16.7 mi
#50361115 kVPROGRESS ENERGY CAROLINAS INCIN SERVICE2.9 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP150590, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP150590 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
TAP154118Substation-AdjacentNCUnion County230 kV300 MW4.3 yrs70.0
UNKNOWN114587Substation-AdjacentNCUnion County230 kV300 MW4.3 yrs69.8
UNKNOWN150888Substation-AdjacentSCDarlington County230 kV300 MW4.3 yrs67.0
Darlington CountyBrownfieldSCDarlington County730 MW3.7 yrs65.8
Greenfield (UNKNOWN114385 - NEWPORT TIE)GreenfieldNCUnion County500 kV1,000 MW4.3 yrs65.2
TAP154125Substation-AdjacentNCMecklenburg County100 kV50 MW4.3 yrs65.2
Greenfield (UNKNOWN114385 - NEWPORT TIE)GreenfieldNCAnson County500 kV1,000 MW4.3 yrs65.0
H B RobinsonBrownfieldSCDarlington County223 MW3.7 yrs64.8

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP150590 substation, North Carolina. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.