TAP150382

Substation

North Carolina · DUKE ENERGY CAROLINAS, LLC

Max voltage
100
kV

TAP150382 is an electric transmission substation in North Carolina, operated by DUKE ENERGY CAROLINAS, LLC. It is classified as distribution (69–115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage100 kV
Min voltage100 kV
Voltage classDistribution (69–115 kV)
Connected lines3

Ownership & operation

OperatorDUKE ENERGY CAROLINAS, LLC
Coordinates36.3879, -80.6702

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#6917100 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE16.7 mi
#26013100 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE0.8 mi
#31873100 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE0.7 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP150382, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP150382 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
ANTIOCHSubstation-AdjacentNCWilkes County500 kV1,000 MW3.1 yrs72.0
MITCHELL RIVERSubstation-AdjacentNCYadkin County230 kV300 MW4.3 yrs67.2
ANTIOCHSubstation-AdjacentNCAlexander County500 kV1,000 MW4.3 yrs66.2
Greenfield (ANTIOCH - JACKSONS FERRY)GreenfieldNCAlleghany County500 kV1,000 MW3.1 yrs66.0
UNKNOWN115091Substation-AdjacentNCStokes County230 kV300 MW4.3 yrs65.7
Greenfield (ANTIOCH - JACKSONS FERRY)GreenfieldVAGalax city500 kV1,000 MW3.1 yrs65.6
Greenfield (ANTIOCH - JACKSONS FERRY)GreenfieldVAGalax city500 kV1,000 MW3.1 yrs65.4
BYLLESBY 2Substation-AdjacentVAGalax city138 kV100 MW3.1 yrs65.0

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP150382 substation, North Carolina. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.