TAP148444
SubstationNorth Carolina · PROGRESS ENERGY CAROLINAS INC
TAP148444 is an electric transmission substation in North Carolina, operated by PROGRESS ENERGY CAROLINAS INC. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Ownership & operation
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #52380 | 115 kV | PROGRESS ENERGY CAROLINAS INC | IN SERVICE | 1.6 mi |
| #52381 | 115 kV | PROGRESS ENERGY CAROLINAS INC | IN SERVICE | 12.7 mi |
| #57817 | 115 kV | PROGRESS ENERGY CAROLINAS INC | IN SERVICE | 12.6 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of TAP148444, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| TAP147987 | Substation-Adjacent | NC | Johnston County | 230 kV | 300 MW | 4.3 yrs | 65.2 |
| UNKNOWN112699 | Substation-Adjacent | NC | Wayne County | 230 kV | 300 MW | 4.3 yrs | 64.4 |
| UNKNOWN112765 | Substation-Adjacent | NC | Sampson County | 230 kV | 300 MW | 4.3 yrs | 63.6 |
| UNKNOWN112758 | Substation-Adjacent | NC | Sampson County | 115 kV | 100 MW | 4.3 yrs | 63.3 |
| CLINTON | Substation-Adjacent | NC | Sampson County | 230 kV | 300 MW | 4.3 yrs | 63.1 |
| UNKNOWN148081 | Substation-Adjacent | NC | Wayne County | 230 kV | 300 MW | 4.3 yrs | 62.8 |
| SEYMOUR JOHNSON | Substation-Adjacent | NC | Wayne County | 115 kV | 100 MW | 4.3 yrs | 62.1 |
| TAP147205 | Substation-Adjacent | NC | Bladen County | 230 kV | 300 MW | 4.3 yrs | 61.6 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for TAP148444 substation, North Carolina. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.