TAP148437

Substation

North Carolina · PROGRESS ENERGY CAROLINAS INC

Max voltage
115
kV

TAP148437 is an electric transmission substation in North Carolina, operated by PROGRESS ENERGY CAROLINAS INC. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorPROGRESS ENERGY CAROLINAS INC
Coordinates34.8569, -77.8404

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#30509115 kVPROGRESS ENERGY CAROLINAS INCIN SERVICE0.0 mi
#42251115 kVPROGRESS ENERGY CAROLINAS INCIN SERVICE5.0 mi
#57238115 kVPROGRESS ENERGY CAROLINAS INCIN SERVICE16.5 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP148437, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP148437 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN112226Substation-AdjacentNCOnslow County230 kV300 MW4.3 yrs62.4
TAP148433Substation-AdjacentNCOnslow County230 kV300 MW4.3 yrs61.7
UNKNOWN162474Substation-AdjacentNCSampson County115 kV100 MW4.3 yrs60.8
Greenfield (UNKNOWN111965 - WOMMACK)GreenfieldNCLenoir County230 kV300 MW4.3 yrs60.7
WALLACESubstation-AdjacentNCDuplin County230 kV300 MW4.3 yrs60.6
UNKNOWN112227Substation-AdjacentNCOnslow County230 kV300 MW4.3 yrs60.6
UNKNOWN112228Substation-AdjacentNCOnslow County230 kV300 MW4.3 yrs60.4
TAP148076Substation-AdjacentNCWayne County115 kV100 MW4.3 yrs60.3

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP148437 substation, North Carolina. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.