TAP148327

Substation

North Carolina · DUKE ENERGY PROGRESS - (NC)

Max voltage
115
kV

TAP148327 is an electric transmission substation in North Carolina, operated by DUKE ENERGY PROGRESS - (NC). It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorDUKE ENERGY PROGRESS - (NC)
Coordinates34.7481, -79.4054

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#7330115 kVDUKE ENERGY PROGRESS - (NC)IN SERVICE0.1 mi
#35483115 kVDUKE ENERGY PROGRESS - (NC)IN SERVICE0.5 mi
#52140115 kVDUKE ENERGY PROGRESS - (NC)IN SERVICE2.4 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP148327, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP148327 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN114385Substation-AdjacentNCRichmond County500 kV1,000 MW4.3 yrs72.2
UNKNOWN169647Substation-AdjacentNCCumberland County230 kV300 MW4.3 yrs67.8
HAMLET GENERATING FACILITYSubstation-AdjacentNCRichmond County230 kV300 MW4.3 yrs67.0
UNKNOWN122412Substation-AdjacentSCMarlboro County230 kV300 MW4.3 yrs66.8
TAP169645Substation-AdjacentNCCumberland County230 kV300 MW4.3 yrs66.7
TAP148344Substation-AdjacentSCMarlboro County230 kV300 MW4.3 yrs66.6
SHORTHORN HOLDINGSSubstation-AdjacentSCMarlboro County230 kV300 MW4.3 yrs65.5
TAP146637Substation-AdjacentSCDillon County230 kV300 MW4.3 yrs65.2

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen