TAP148295
SubstationNorth Carolina
TAP148295 is an electric transmission substation in North Carolina. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Ownership & operation
Operator not catalogued for this substation.
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #199 | 115 kV | — | IN SERVICE | 7.0 mi |
| #38472 | 115 kV | — | IN SERVICE | 0.1 mi |
| #39326 | 115 kV | — | IN SERVICE | 5.3 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of TAP148295, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| UNKNOWN114916 | Substation-Adjacent | NC | Forsyth County | 230 kV | 300 MW | 4.3 yrs | 66.7 |
| UNKNOWN114159 | Substation-Adjacent | NC | Moore County | 230 kV | 300 MW | 4.3 yrs | 66.7 |
| PLEASANT GARDEN | Substation-Adjacent | NC | Guilford County | 500 kV | 1,000 MW | 4.3 yrs | 65.7 |
| Greenfield (UNKNOWN114541 - PLEASANT GARDE) | Greenfield | NC | Guilford County | 500 kV | 1,000 MW | 4.3 yrs | 65.4 |
| Greenfield (UNKNOWN114541 - PLEASANT GARDE) | Greenfield | NC | Alamance County | 500 kV | 1,000 MW | 4.3 yrs | 65.1 |
| Greenfield (PLEASANT GARDEN - WOODLEAF SWI) | Greenfield | NC | Randolph County | 500 kV | 1,000 MW | 4.3 yrs | 64.1 |
| TAP147642 | Substation-Adjacent | NC | Moore County | 230 kV | 300 MW | 4.3 yrs | 64.1 |
| BEAR CREEK SOLAR | Substation-Adjacent | NC | Chatham County | 115 kV | 100 MW | 4.3 yrs | 63.1 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.