TAP148250

Substation

North Carolina · PROGRESS ENERGY CAROLINAS INC

Max voltage
115
kV

TAP148250 is an electric transmission substation in North Carolina, operated by PROGRESS ENERGY CAROLINAS INC. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorPROGRESS ENERGY CAROLINAS INC
Coordinates35.2809, -77.7687

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#13525115 kVPROGRESS ENERGY CAROLINAS INCIN SERVICE2.1 mi
#24062115 kVPROGRESS ENERGY CAROLINAS INCIN SERVICE6.2 mi
#51292115 kVPROGRESS ENERGY CAROLINAS INCIN SERVICE0.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP148250, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP148250 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN112699Substation-AdjacentNCWayne County230 kV300 MW4.3 yrs64.4
UNKNOWN172565Substation-AdjacentNCPitt County230 kV300 MW4.3 yrs64.1
UNKNOWN112689Substation-AdjacentNCWilson County115 kV100 MW4.3 yrs63.3
UNKNOWN111469Substation-AdjacentNCGreene County230 kV300 MW4.3 yrs63.2
UNKNOWN148081Substation-AdjacentNCWayne County230 kV300 MW4.3 yrs62.8
UNKNOWN169951Substation-AdjacentNCWayne County115 kV100 MW4.3 yrs62.4
UNKNOWN111965Substation-AdjacentNCLenoir County230 kV300 MW4.3 yrs62.4
SEYMOUR JOHNSONSubstation-AdjacentNCWayne County115 kV100 MW4.3 yrs62.1

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP148250 substation, North Carolina. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.