TAP148077

Substation

North Carolina · PROGRESS ENERGY CAROLINAS INC

Max voltage
115
kV

TAP148077 is an electric transmission substation in North Carolina, operated by PROGRESS ENERGY CAROLINAS INC. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorPROGRESS ENERGY CAROLINAS INC
Coordinates35.2970, -78.0826

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#17275115 kVPROGRESS ENERGY CAROLINAS INCIN SERVICE4.0 mi
#24402115 kVPROGRESS ENERGY CAROLINAS INCIN SERVICE9.2 mi
#48757115 kVPROGRESS ENERGY CAROLINAS INCIN SERVICE0.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP148077, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP148077 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN113479Substation-AdjacentNCJohnston County230 kV300 MW4.3 yrs69.8
UNKNOWN113480Substation-AdjacentNCJohnston County230 kV300 MW4.3 yrs67.5
TAP147988Substation-AdjacentNCJohnston County230 kV300 MW4.3 yrs65.5
TAP147987Substation-AdjacentNCJohnston County230 kV300 MW4.3 yrs65.2
UNKNOWN112699Substation-AdjacentNCWayne County230 kV300 MW4.3 yrs64.4
UNKNOWN113509Substation-AdjacentNCJohnston County230 kV300 MW4.3 yrs64.4
TAP148043Substation-AdjacentNCJohnston County230 kV300 MW4.3 yrs63.7
UNKNOWN112765Substation-AdjacentNCSampson County230 kV300 MW4.3 yrs63.6

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP148077 substation, North Carolina. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.