TAP148066
SubstationNorth Carolina · DUKE ENERGY PROGRESS - (NC)
TAP148066 is an electric transmission substation in North Carolina, operated by DUKE ENERGY PROGRESS - (NC). It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Ownership & operation
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #43053 | 115 kV | DUKE ENERGY PROGRESS - (NC) | IN SERVICE | 2.2 mi |
| #44656 | 115 kV | DUKE ENERGY PROGRESS - (NC) | IN SERVICE | 2.5 mi |
| #45888 | 115 kV | DUKE ENERGY PROGRESS - (NC) | IN SERVICE | 0.0 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of TAP148066, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| UNKNOWN113480 | Substation-Adjacent | NC | Johnston County | 230 kV | 300 MW | 4.3 yrs | 67.5 |
| TAP148063 | Substation-Adjacent | NC | Wilson County | 230 kV | 300 MW | 4.3 yrs | 67.0 |
| UNKNOWN111486 | Substation-Adjacent | NC | Wilson County | 230 kV | 300 MW | 4.3 yrs | 67.0 |
| UNKNOWN111947 | Substation-Adjacent | NC | Edgecombe County | 230 kV | 300 MW | 4.3 yrs | 65.8 |
| Greenfield (WAKE - CARSON) | Greenfield | NC | Franklin County | 500 kV | 1,000 MW | 3.1 yrs | 65.5 |
| TAP169840 | Substation-Adjacent | NC | Nash County | 230 kV | 300 MW | 4.3 yrs | 65.2 |
| Greenfield (WAKE - CARSON) | Greenfield | NC | Franklin County | 500 kV | 1,000 MW | 3.1 yrs | 65.2 |
| UNKNOWN133864 | Substation-Adjacent | NC | Johnston County | 230 kV | 300 MW | 4.3 yrs | 65.1 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for TAP148066 substation, North Carolina. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.