TAP147981

Substation

North Carolina · DUKE ENERGY PROGRESS - (NC)

Max voltage
230
kV

TAP147981 is an electric transmission substation in North Carolina, operated by DUKE ENERGY PROGRESS - (NC). It is classified as high-voltage (230 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines3

Ownership & operation

OperatorDUKE ENERGY PROGRESS - (NC)
Co-ownerPROGRESS ENERGY CAROLINAS INC
Coordinates36.2212, -78.2770

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#1074230 kVPROGRESS ENERGY CAROLINAS INCIN SERVICE0.1 mi
#1570230 kVPROGRESS ENERGY CAROLINAS INCIN SERVICE3.0 mi
#21607230 kVDUKE ENERGY PROGRESS - (NC)IN SERVICE25.7 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP147981, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP147981 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
TAP147178Substation-AdjacentNCWake County230 kV300 MW4.3 yrs72.3
UNKNOWN115460Substation-AdjacentNCWake County230 kV300 MW4.3 yrs71.1
TAP147195Substation-AdjacentNCWake County230 kV300 MW4.3 yrs70.3
TAP147996Substation-AdjacentVAMecklenburg County115 kV100 MW3.1 yrs69.9
UNKNOWN115457Substation-AdjacentNCWake County230 kV300 MW4.3 yrs69.6
UNKNOWN115459Substation-AdjacentNCWake County230 kV300 MW4.3 yrs69.4
KERR DAMSubstation-AdjacentVAMecklenburg County115 kV100 MW3.1 yrs69.3
BEECHWOOD DPSubstation-AdjacentVAMecklenburg County115 kV100 MW3.1 yrs68.1

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.