TAP147798
SubstationNorth Carolina
TAP147798 is an electric transmission substation in North Carolina. It is classified as distribution (69–115 kv) and connects 6 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Ownership & operation
Operator not catalogued for this substation.
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #7588 | 100 kV | — | IN SERVICE | 2.2 mi |
| #19636 | 100 kV | — | IN SERVICE | 2.2 mi |
| #23229 | 100 kV | — | IN SERVICE | 1.6 mi |
| #29311 | 100 kV | — | IN SERVICE | 1.9 mi |
| #29875 | 100 kV | — | IN SERVICE | 1.9 mi |
| #30528 | 100 kV | — | IN SERVICE | 1.6 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of TAP147798, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| Dan River | Brownfield | NC | Rockingham | — | 388 MW | — | 70.7 |
| DAN RIVER | Substation-Adjacent | NC | Rockingham County | 138 kV | 100 MW | 3.1 yrs | 67.2 |
| UNKNOWN114916 | Substation-Adjacent | NC | Forsyth County | 230 kV | 300 MW | 4.3 yrs | 66.7 |
| UNKNOWN115091 | Substation-Adjacent | NC | Stokes County | 230 kV | 300 MW | 4.3 yrs | 65.7 |
| UNKNOWN115024 | Substation-Adjacent | NC | Guilford County | 230 kV | 300 MW | 4.3 yrs | 65.7 |
| PLEASANT GARDEN | Substation-Adjacent | NC | Guilford County | 500 kV | 1,000 MW | 4.3 yrs | 65.7 |
| Greenfield (UNKNOWN114541 - PLEASANT GARDE) | Greenfield | NC | Guilford County | 500 kV | 1,000 MW | 4.3 yrs | 65.4 |
| UNKNOWN115021 | Substation-Adjacent | NC | Guilford County | 230 kV | 300 MW | 4.3 yrs | 65.2 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for TAP147798 substation, North Carolina. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.