TAP147673

Substation

North Carolina · PROGRESS ENERGY CAROLINAS INC

Max voltage
230
kV

TAP147673 is an electric transmission substation in North Carolina, operated by PROGRESS ENERGY CAROLINAS INC. It is classified as high-voltage (230 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines3

Ownership & operation

OperatorPROGRESS ENERGY CAROLINAS INC
Coordinates35.2817, -78.9965

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#36181230 kVPROGRESS ENERGY CAROLINAS INCIN SERVICE0.1 mi
#41927230 kVPROGRESS ENERGY CAROLINAS INCIN SERVICE6.4 mi
#57146230 kVPROGRESS ENERGY CAROLINAS INCIN SERVICE8.8 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP147673, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP147673 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN115248Substation-AdjacentNCWake County230 kV300 MW4.3 yrs70.3
TAP147405Substation-AdjacentNCWake County230 kV300 MW4.3 yrs70.0
UNKNOWN115177Substation-AdjacentNCChatham County230 kV300 MW4.3 yrs69.4
UNKNOWN115247Substation-AdjacentNCWake County230 kV300 MW4.3 yrs69.3
TAP147404Substation-AdjacentNCWake County230 kV300 MW4.3 yrs69.1
UNKNOWN114151Substation-AdjacentNCLee County230 kV300 MW4.3 yrs69.0
TAP147408Substation-AdjacentNCHarnett County230 kV300 MW4.3 yrs68.8
UNKNOWN114312Substation-AdjacentNCLee County230 kV300 MW4.3 yrs68.8

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP147673 substation, North Carolina. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.