TAP147649

Substation

North Carolina

Max voltage
100
kV

TAP147649 is an electric transmission substation in North Carolina. It is classified as distribution (69–115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage100 kV
Min voltage100 kV
Voltage classDistribution (69–115 kV)
Connected lines3

Ownership & operation

Operator not catalogued for this substation.

Coordinates36.0947, -79.2969

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#34031100 kVIN SERVICE3.8 mi
#34108100 kVIN SERVICE24.5 mi
#48532100 kVIN SERVICE0.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP147649, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP147649 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN114540Substation-AdjacentNCDurham County230 kV300 MW4.3 yrs72.7
UNKNOWN115116Substation-AdjacentNCDurham County230 kV300 MW4.3 yrs71.4
PERSONSubstation-AdjacentNCPerson County500 kV1,000 MW4.3 yrs70.2
TAP147453Substation-AdjacentNCChatham County230 kV300 MW4.3 yrs69.9
ENOSubstation-AdjacentNCOrange County230 kV300 MW4.3 yrs69.9
UNKNOWN114541Substation-AdjacentNCOrange County500 kV1,000 MW4.3 yrs69.7
Greenfield (UNKNOWN114541 - PLEASANT GARDE)GreenfieldNCChatham County500 kV1,000 MW4.3 yrs68.7
UNKNOWN113945Substation-AdjacentNCCaswell County230 kV300 MW4.3 yrs67.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP147649 substation, North Carolina. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.