TAP147417 is an electric transmission substation in North Carolina. It is classified as high-voltage (230 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines3

Ownership & operation

Operator not catalogued for this substation.

Coordinates35.7756, -78.6780

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#23033230 kVIN SERVICE0.0 mi
#25836230 kVIN SERVICE3.2 mi
#38294230 kVIN SERVICE1.6 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP147417, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP147417 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
WAKESubstation-AdjacentNCWake County500 kV1,000 MW3.1 yrs76.2
TAP147409Substation-AdjacentNCWake County230 kV300 MW4.3 yrs73.1
TAP147412Substation-AdjacentNCWake County230 kV300 MW4.3 yrs73.1
TAP160803Substation-AdjacentNCWake County230 kV300 MW4.3 yrs72.9
UNKNOWN114536Substation-AdjacentNCDurham County230 kV300 MW4.3 yrs72.8
UNKNOWN114540Substation-AdjacentNCDurham County230 kV300 MW4.3 yrs72.7
WAKESubstation-AdjacentNCWake County500 kV1,000 MW4.3 yrs72.5
TAP147178Substation-AdjacentNCWake County230 kV300 MW4.3 yrs72.3

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.