TAP147405
SubstationNorth Carolina
TAP147405 is an electric transmission substation in North Carolina. It is classified as high-voltage (230 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Ownership & operation
Operator not catalogued for this substation.
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #20602 | 230 kV | — | IN SERVICE | 0.0 mi |
| #31351 | 230 kV | — | IN SERVICE | 3.8 mi |
| #49430 | 230 kV | — | IN SERVICE | 0.1 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of TAP147405, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| WAKE | Substation-Adjacent | NC | Wake County | 500 kV | 1,000 MW | 3.1 yrs | 76.2 |
| TAP147412 | Substation-Adjacent | NC | Wake County | 230 kV | 300 MW | 4.3 yrs | 73.1 |
| TAP147409 | Substation-Adjacent | NC | Wake County | 230 kV | 300 MW | 4.3 yrs | 73.1 |
| TAP160803 | Substation-Adjacent | NC | Wake County | 230 kV | 300 MW | 4.3 yrs | 72.9 |
| UNKNOWN114536 | Substation-Adjacent | NC | Durham County | 230 kV | 300 MW | 4.3 yrs | 72.8 |
| UNKNOWN114540 | Substation-Adjacent | NC | Durham County | 230 kV | 300 MW | 4.3 yrs | 72.7 |
| WAKE | Substation-Adjacent | NC | Wake County | 500 kV | 1,000 MW | 4.3 yrs | 72.5 |
| TAP147178 | Substation-Adjacent | NC | Wake County | 230 kV | 300 MW | 4.3 yrs | 72.3 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for TAP147405 substation, North Carolina. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.