TAP147392

Substation

North Carolina · PROGRESS ENERGY CAROLINAS INC

Max voltage
115
kV

TAP147392 is an electric transmission substation in North Carolina, operated by PROGRESS ENERGY CAROLINAS INC. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorPROGRESS ENERGY CAROLINAS INC
Coordinates35.1136, -78.7902

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#38460115 kVPROGRESS ENERGY CAROLINAS INCIN SERVICE1.9 mi
#42449115 kVPROGRESS ENERGY CAROLINAS INCIN SERVICE0.1 mi
#57196115 kVPROGRESS ENERGY CAROLINAS INCIN SERVICE6.8 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP147392, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP147392 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
JONESBOROSubstation-AdjacentNCLee County230 kV300 MW4.3 yrs68.5
TAP147669Substation-AdjacentNCCumberland County230 kV300 MW4.3 yrs68.1
WOODRUFF STREETSubstation-AdjacentNCCumberland County230 kV300 MW4.3 yrs67.9
UNKNOWN169647Substation-AdjacentNCCumberland County230 kV300 MW4.3 yrs67.8
TAP146709Substation-AdjacentNCLee County230 kV300 MW4.3 yrs67.4
UNKNOWN113506Substation-AdjacentNCJohnston County230 kV300 MW4.3 yrs67.0
UNKNOWN113996Substation-AdjacentNCHarnett County230 kV300 MW4.3 yrs67.0
TAP169645Substation-AdjacentNCCumberland County230 kV300 MW4.3 yrs66.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP147392 substation, North Carolina. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.