TAP147260

Substation

North Carolina · PROGRESS ENERGY CAROLINAS INC

Max voltage
230
kV

TAP147260 is an electric transmission substation in North Carolina, operated by PROGRESS ENERGY CAROLINAS INC. It is classified as high-voltage (230 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines3

Ownership & operation

OperatorPROGRESS ENERGY CAROLINAS INC
Coordinates34.1085, -78.3420

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#2351230 kVPROGRESS ENERGY CAROLINAS INCIN SERVICE19.4 mi
#4918230 kVPROGRESS ENERGY CAROLINAS INCIN SERVICE29.5 mi
#37315230 kVPROGRESS ENERGY CAROLINAS INCIN SERVICE0.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP147260, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP147260 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN121806Substation-AdjacentSCHorry County115 kV100 MW3.7 yrs68.9
L V SUTTON COMBINED CYCLESubstation-AdjacentNCNew Hanover County230 kV300 MW4.3 yrs67.2
UNKNOWN162126Substation-AdjacentSCHorry County115 kV100 MW3.7 yrs66.0
TAP147267Substation-AdjacentSCHorry County115 kV100 MW3.7 yrs65.3
TAP148386Substation-AdjacentNCBrunswick County230 kV300 MW4.3 yrs64.9
TAP158331Substation-AdjacentNCBladen County230 kV300 MW4.3 yrs64.5
TAP148388Substation-AdjacentNCBrunswick County230 kV300 MW4.3 yrs63.3
UNKNOWN112400Substation-AdjacentNCBrunswick County230 kV300 MW4.3 yrs63.1

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen