TAP147244

Substation

North Carolina · DUKE ENERGY PROGRESS - (NC)

Max voltage
115
kV

TAP147244 is an electric transmission substation in North Carolina, operated by DUKE ENERGY PROGRESS - (NC). It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorDUKE ENERGY PROGRESS - (NC)
Co-ownerPROGRESS ENERGY CAROLINAS INC
Coordinates34.5409, -78.8284

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#22857115 kVPROGRESS ENERGY CAROLINAS INCIN SERVICE0.0 mi
#44302115 kVPROGRESS ENERGY CAROLINAS INCIN SERVICE6.6 mi
#57785115 kVDUKE ENERGY PROGRESS - (NC)IN SERVICE11.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP147244, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP147244 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN114004Substation-AdjacentNCRobeson County230 kV300 MW4.3 yrs66.4
UNKNOWN112359Substation-AdjacentNCRobeson County230 kV300 MW4.3 yrs65.7
TAP147236Substation-AdjacentNCColumbus County230 kV300 MW4.3 yrs64.7
TAP158331Substation-AdjacentNCBladen County230 kV300 MW4.3 yrs64.5
UNKNOWN112294Substation-AdjacentNCColumbus County230 kV300 MW4.3 yrs64.5
UNKNOWN113104Substation-AdjacentNCRobeson County230 kV300 MW4.3 yrs63.4
WEATHERSPOON PLANT STATIONSubstation-AdjacentNCRobeson County230 kV300 MW4.3 yrs62.8
UNKNOWN112356Substation-AdjacentNCBladen County230 kV300 MW4.3 yrs62.8

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP147244 substation, North Carolina. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.