TAP147211

Substation

North Carolina · PROGRESS ENERGY CAROLINAS INC

Max voltage
115
kV

TAP147211 is an electric transmission substation in North Carolina, operated by PROGRESS ENERGY CAROLINAS INC. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorPROGRESS ENERGY CAROLINAS INC
Coordinates34.7326, -78.9620

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#2139115 kVPROGRESS ENERGY CAROLINAS INCIN SERVICE4.0 mi
#27396115 kVPROGRESS ENERGY CAROLINAS INCIN SERVICE15.2 mi
#32665115 kVPROGRESS ENERGY CAROLINAS INCIN SERVICE0.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP147211, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP147211 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
TAP147669Substation-AdjacentNCCumberland County230 kV300 MW4.3 yrs68.1
UNKNOWN169647Substation-AdjacentNCCumberland County230 kV300 MW4.3 yrs67.8
TAP169645Substation-AdjacentNCCumberland County230 kV300 MW4.3 yrs66.7
UNKNOWN114004Substation-AdjacentNCRobeson County230 kV300 MW4.3 yrs66.4
TAP146919Substation-AdjacentNCCumberland County230 kV300 MW4.3 yrs66.0
FAYETTEVILLESubstation-AdjacentNCCumberland County230 kV300 MW4.3 yrs66.0
CUMBERLANDSubstation-AdjacentNCCumberland County500 kV1,000 MW4.3 yrs65.7
UNKNOWN112359Substation-AdjacentNCRobeson County230 kV300 MW4.3 yrs65.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP147211 substation, North Carolina. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.