TAP147160

Substation

North Carolina · DUKE ENERGY PROGRESS - (NC)

Max voltage
230
kV

TAP147160 is an electric transmission substation in North Carolina, operated by DUKE ENERGY PROGRESS - (NC). It is classified as high-voltage (230 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines3

Ownership & operation

OperatorDUKE ENERGY PROGRESS - (NC)
Coordinates36.3604, -78.5849

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#3533230 kVDUKE ENERGY PROGRESS - (NC)IN SERVICE10.4 mi
#5018230 kVIN SERVICE0.9 mi
#19397230 kVIN SERVICE3.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP147160, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP147160 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN115116Substation-AdjacentNCDurham County230 kV300 MW4.3 yrs71.4
MAYOSubstation-AdjacentNCPerson County500 kV1,000 MW4.3 yrs70.5
TAP147996Substation-AdjacentVAMecklenburg County115 kV100 MW3.1 yrs69.9
KERR DAMSubstation-AdjacentVAMecklenburg County115 kV100 MW3.1 yrs69.3
TAP147395Substation-AdjacentNCDurham County230 kV300 MW4.3 yrs68.1
BEECHWOOD DPSubstation-AdjacentVAMecklenburg County115 kV100 MW3.1 yrs68.1
Greenfield (DURHAM - WAKE)GreenfieldNCDurham County500 kV1,000 MW4.3 yrs68.1
Greenfield (MAYO - DURHAM)GreenfieldNCDurham County500 kV1,000 MW4.3 yrs67.9

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP147160 substation, North Carolina. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.