TAP147003

Substation

North Carolina

Max voltage
100
kV

TAP147003 is an electric transmission substation in North Carolina. It is classified as distribution (69–115 kv) and connects 6 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage100 kV
Min voltage100 kV
Voltage classDistribution (69–115 kV)
Connected lines6

Ownership & operation

Operator not catalogued for this substation.

Coordinates36.1133, -79.6090

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#4812100 kVIN SERVICE0.1 mi
#7549100 kVIN SERVICE0.1 mi
#19003100 kVIN SERVICE10.5 mi
#19140100 kVIN SERVICE4.5 mi
#25695100 kVIN SERVICE10.5 mi
#45949100 kVIN SERVICE4.5 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP147003, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP147003 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
Dan RiverBrownfieldNCRockingham388 MW70.7
UNKNOWN113945Substation-AdjacentNCCaswell County230 kV300 MW4.3 yrs67.7
DAN RIVERSubstation-AdjacentNCRockingham County138 kV100 MW3.1 yrs67.2
PLEASANT GARDENSubstation-AdjacentNCGuilford County500 kV1,000 MW4.3 yrs65.7
UNKNOWN115024Substation-AdjacentNCGuilford County230 kV300 MW4.3 yrs65.7
Greenfield (UNKNOWN114541 - PLEASANT GARDE)GreenfieldNCGuilford County500 kV1,000 MW4.3 yrs65.4
UNKNOWN115021Substation-AdjacentNCGuilford County230 kV300 MW4.3 yrs65.2
Greenfield (UNKNOWN114541 - PLEASANT GARDE)GreenfieldNCAlamance County500 kV1,000 MW4.3 yrs65.1

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP147003 substation, North Carolina. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.