TAP146994

Substation

North Carolina · DUKE ENERGY CAROLINAS, LLC

Max voltage
100
kV

TAP146994 is an electric transmission substation in North Carolina, operated by DUKE ENERGY CAROLINAS, LLC. It is classified as distribution (69–115 kv) and connects 6 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage100 kV
Min voltage100 kV
Voltage classDistribution (69–115 kV)
Connected lines6

Ownership & operation

OperatorDUKE ENERGY CAROLINAS, LLC
Coordinates36.3677, -79.6899

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#52877100 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE7.6 mi
#52878100 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE7.6 mi
#52883100 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE0.0 mi
#52884100 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE0.0 mi
#57789100 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE2.8 mi
#57791100 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE3.8 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP146994, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP146994 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
Dan RiverBrownfieldNCRockingham388 MW70.7
EAST DANVILLESubstation-AdjacentVADanville city230 kV300 MW3.1 yrs67.8
UNKNOWN113945Substation-AdjacentNCCaswell County230 kV300 MW4.3 yrs67.7
DAN RIVERSubstation-AdjacentNCRockingham County138 kV100 MW3.1 yrs67.2
UNKNOWN115024Substation-AdjacentNCGuilford County230 kV300 MW4.3 yrs65.7
UNKNOWN114453Substation-AdjacentVADanville city138 kV100 MW3.1 yrs65.4
UNKNOWN114625Substation-AdjacentVAMartinsville city138 kV100 MW3.1 yrs65.4
FIELDALESubstation-AdjacentVAMartinsville city138 kV100 MW3.1 yrs65.4

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP146994 substation, North Carolina. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.