TAP146952
SubstationNorth Carolina · VIRGINIA ELECTRIC & POWER CO
TAP146952 is an electric transmission substation in North Carolina, operated by VIRGINIA ELECTRIC & POWER CO. It is classified as high-voltage (230 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Ownership & operation
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #25247 | 230 kV | VIRGINIA ELECTRIC & POWER CO | IN SERVICE | 8.5 mi |
| #27697 | 230 kV | VIRGINIA ELECTRIC & POWER CO | IN SERVICE | 1.6 mi |
| #38671 | 230 kV | VIRGINIA ELECTRIC & POWER CO | IN SERVICE | 0.4 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of TAP146952, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| UNKNOWN111643 | Substation-Adjacent | NC | Chowan County | 230 kV | 300 MW | 4.3 yrs | 66.8 |
| WINFALL | Substation-Adjacent | NC | Perquimans County | 230 kV | 300 MW | 4.3 yrs | 63.8 |
| EVERETTS | Substation-Adjacent | NC | Bertie County | 230 kV | 300 MW | 4.3 yrs | 63.0 |
| UNKNOWN169539 | Substation-Adjacent | NC | Bertie County | 230 kV | 300 MW | 4.3 yrs | 62.5 |
| UNKNOWN111623 | Substation-Adjacent | NC | Washington County | 230 kV | 300 MW | 4.3 yrs | 61.8 |
| MACKEYS | Substation-Adjacent | NC | Washington County | 230 kV | 300 MW | 4.3 yrs | 61.6 |
| TAP147061 | Substation-Adjacent | NC | Pasquotank County | 230 kV | 300 MW | 4.3 yrs | 61.0 |
| TAP169540 | Substation-Adjacent | NC | Bertie County | 230 kV | 300 MW | 4.3 yrs | 59.9 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for TAP146952 substation, North Carolina. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.