TAP146918

Substation

North Carolina · DUKE ENERGY PROGRESS - (NC)

Max voltage
230
kV

TAP146918 is an electric transmission substation in North Carolina, operated by DUKE ENERGY PROGRESS - (NC). It is classified as high-voltage (230 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines3

Ownership & operation

OperatorDUKE ENERGY PROGRESS - (NC)
Coordinates36.4791, -78.8733

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#13714230 kVIN SERVICE0.3 mi
#36798230 kVIN SERVICE1.8 mi
#57764230 kVDUKE ENERGY PROGRESS - (NC)IN SERVICE28.7 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP146918, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP146918 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
CLOVERSubstation-AdjacentVACharlotte County230 kV300 MW3.0 yrs74.8
CLOVERSubstation-AdjacentVACharlotte County500 kV1,000 MW3.1 yrs74.6
MAYOSubstation-AdjacentNCPerson County500 kV1,000 MW4.3 yrs70.5
Greenfield (CLOVER - UNKNOWN175464)GreenfieldVACharlotte County500 kV1,000 MW3.1 yrs70.4
PERSONSubstation-AdjacentNCPerson County500 kV1,000 MW4.3 yrs70.2
Greenfield (CLOVER - UNKNOWN175464)GreenfieldVAMecklenburg County500 kV1,000 MW3.1 yrs70.1
TAP147994Substation-AdjacentVAMecklenburg County115 kV100 MW3.1 yrs70.0
TAP147996Substation-AdjacentVAMecklenburg County115 kV100 MW3.1 yrs69.9

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP146918 substation, North Carolina. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.