TAP146810
SubstationNorth Carolina · DUKE ENERGY PROGRESS - (NC)
TAP146810 is an electric transmission substation in North Carolina, operated by DUKE ENERGY PROGRESS - (NC). It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Ownership & operation
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #52161 | 115 kV | PROGRESS ENERGY CAROLINAS INC | IN SERVICE | 2.2 mi |
| #52162 | 115 kV | PROGRESS ENERGY CAROLINAS INC | IN SERVICE | 0.0 mi |
| #52180 | 115 kV | DUKE ENERGY PROGRESS - (NC) | IN SERVICE | 11.9 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of TAP146810, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| TAP148344 | Substation-Adjacent | SC | Marlboro County | 230 kV | 300 MW | 4.3 yrs | 66.6 |
| UNKNOWN114004 | Substation-Adjacent | NC | Robeson County | 230 kV | 300 MW | 4.3 yrs | 66.4 |
| FAYETTEVILLE | Substation-Adjacent | NC | Cumberland County | 230 kV | 300 MW | 4.3 yrs | 66.0 |
| UNKNOWN112359 | Substation-Adjacent | NC | Robeson County | 230 kV | 300 MW | 4.3 yrs | 65.7 |
| SHORTHORN HOLDINGS | Substation-Adjacent | SC | Marlboro County | 230 kV | 300 MW | 4.3 yrs | 65.5 |
| TAP146637 | Substation-Adjacent | SC | Dillon County | 230 kV | 300 MW | 4.3 yrs | 65.2 |
| UNKNOWN114104 | Substation-Adjacent | NC | Cumberland County | 230 kV | 300 MW | 4.3 yrs | 65.1 |
| TAP147236 | Substation-Adjacent | NC | Columbus County | 230 kV | 300 MW | 4.3 yrs | 64.7 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.