TAP142285
SubstationNorth Carolina · PROGRESS ENERGY CAROLINAS INC
TAP142285 is an electric transmission substation in North Carolina, operated by PROGRESS ENERGY CAROLINAS INC. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Ownership & operation
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #1469 | 115 kV | PROGRESS ENERGY CAROLINAS INC | IN SERVICE | 0.6 mi |
| #58223 | 115 kV | PROGRESS ENERGY CAROLINAS INC | IN SERVICE | 4.7 mi |
| #58239 | 115 kV | PROGRESS ENERGY CAROLINAS INC | IN SERVICE | 1.1 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of TAP142285, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| TAP142264 | Substation-Adjacent | SC | Calhoun County | 230 kV | 300 MW | 3.7 yrs | 73.7 |
| WATEREE STATION | Substation-Adjacent | SC | Calhoun County | 230 kV | 300 MW | 3.7 yrs | 71.4 |
| TAP142288 | Substation-Adjacent | SC | Clarendon County | 230 kV | 300 MW | 3.7 yrs | 70.7 |
| UNKNOWN120919 | Substation-Adjacent | SC | Clarendon County | 230 kV | 300 MW | 3.7 yrs | 70.7 |
| Greenfield (WATEREE STATION - UNKNOWN17011) | Greenfield | SC | Calhoun County | 230 kV | 300 MW | 3.7 yrs | 68.1 |
| UNKNOWN150544 | Substation-Adjacent | SC | Clarendon County | 115 kV | 100 MW | 3.7 yrs | 67.8 |
| Greenfield (UNKNOWN120831 - WATEREE STATIO) | Greenfield | SC | Calhoun County | 230 kV | 300 MW | 3.7 yrs | 67.5 |
| TAP170187 | Substation-Adjacent | SC | Lee County | 230 kV | 300 MW | 4.3 yrs | 67.3 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for TAP142285 substation, North Carolina. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.