TAP142235

Substation

North Carolina · GEORGIA POWER CO

Max voltage
115
kV

TAP142235 is an electric transmission substation in North Carolina, operated by GEORGIA POWER CO. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorGEORGIA POWER CO
Coordinates33.9118, -83.9799

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#34595115 kVGEORGIA POWER COIN SERVICE2.3 mi
#44892115 kVGEORGIA POWER COIN SERVICE1.3 mi
#55539115 kVGEORGIA POWER COIN SERVICE1.8 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP142235, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP142235 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
KLONDIKESubstation-AdjacentGARockdale County500 kV1,000 MW5.8 yrs79.8
UNKNOWN111545Substation-AdjacentGAFulton County230 kV300 MW5.8 yrs77.0
UNKNOWN111533Substation-AdjacentGAFulton County230 kV300 MW5.8 yrs76.5
UNKNOWN116609Substation-AdjacentGADeKalb County230 kV300 MW5.8 yrs76.0
UNKNOWN116601Substation-AdjacentGADeKalb County230 kV300 MW5.8 yrs75.8
UNKNOWN116018Substation-AdjacentGAClayton County230 kV300 MW5.8 yrs75.7
MPC GENERATINGSubstation-AdjacentGAWalton County230 kV300 MW5.8 yrs75.7
W R Clayton PlantBrownfieldGAWalton513 MW75.6

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP142235 substation, North Carolina. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.