TAP142228

Substation

North Carolina · GEORGIA POWER CO

Max voltage
115
kV

TAP142228 is an electric transmission substation in North Carolina, operated by GEORGIA POWER CO. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorGEORGIA POWER CO
Coordinates33.8911, -83.3566

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#4901115 kVGEORGIA POWER COIN SERVICE7.2 mi
#31657115 kVGEORGIA POWER COIN SERVICE1.7 mi
#36709115 kVGEORGIA POWER COIN SERVICE0.7 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP142228, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP142228 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
MPC GENERATINGSubstation-AdjacentGAWalton County230 kV300 MW5.8 yrs75.7
W R Clayton PlantBrownfieldGAWalton513 MW75.6
EAST SOCIAL CIRCLESubstation-AdjacentGAWalton County230 kV300 MW5.8 yrs71.4
UNKNOWN156831Substation-AdjacentGANewton County115 kV100 MW5.8 yrs70.8
UNKNOWN116143Substation-AdjacentGANewton County115 kV100 MW5.8 yrs69.9
UNKNOWN142331Substation-AdjacentGAWalton County230 kV300 MW5.8 yrs69.0
DEADEND169067Substation-AdjacentGAWalton County115 kV100 MW5.8 yrs68.7
UNKNOWN116150Substation-AdjacentGAWalton County115 kV100 MW5.8 yrs68.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP142228 substation, North Carolina. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.