TAP141834
SubstationNorth Carolina
TAP141834 is an electric transmission substation in North Carolina. It is classified as sub-transmission (115 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Ownership & operation
Operator not catalogued for this substation.
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #32414 | 115 kV | — | IN SERVICE | 7.5 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of TAP141834, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| UNKNOWN113497 | Substation-Adjacent | GA | Columbia County | 230 kV | 300 MW | 3.7 yrs | 75.6 |
| UNKNOWN117189 | Substation-Adjacent | SC | Aiken County | 230 kV | 300 MW | 3.7 yrs | 75.3 |
| TAP161836 | Substation-Adjacent | GA | Columbia County | 230 kV | 300 MW | 3.7 yrs | 74.2 |
| UNKNOWN113463 | Substation-Adjacent | GA | Richmond County | 230 kV | 300 MW | 3.7 yrs | 73.3 |
| UNKNOWN173407 | Substation-Adjacent | GA | Richmond County | 115 kV | 100 MW | 3.7 yrs | 72.4 |
| UNKNOWN153963 | Substation-Adjacent | SC | Aiken County | 230 kV | 300 MW | 3.7 yrs | 72.0 |
| TAP153959 | Substation-Adjacent | SC | Aiken County | 115 kV | 100 MW | 3.7 yrs | 71.9 |
| UNKNOWN170038 | Substation-Adjacent | SC | Edgefield County | 115 kV | 100 MW | 3.7 yrs | 71.9 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for TAP141834 substation, North Carolina. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.