RIPP SWITCHING STATION
SubstationNorth Carolina · DUKE ENERGY CAROLINAS, LLC
RIPP SWITCHING STATION is an electric transmission substation in North Carolina, operated by DUKE ENERGY CAROLINAS, LLC. It is classified as high-voltage (230 kv) and connects 10 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Ownership & operation
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #84 | 230 kV | DUKE ENERGY CAROLINAS, LLC | IN SERVICE | 9.8 mi |
| #7108 | 230 kV | DUKE ENERGY CAROLINAS, LLC | IN SERVICE | 10.0 mi |
| #18699 | 230 kV | DUKE ENERGY CAROLINAS, LLC | — | 0.3 mi |
| #18855 | 230 kV | DUKE ENERGY CAROLINAS, LLC | IN SERVICE | 10.0 mi |
| #24467 | 230 kV | DUKE ENERGY CAROLINAS, LLC | IN SERVICE | 24.4 mi |
| #26594 | 230 kV | DUKE ENERGY CAROLINAS, LLC | IN SERVICE | 30.1 mi |
| #30805 | 230 kV | DUKE ENERGY CAROLINAS, LLC | IN SERVICE | 1.9 mi |
| #42221 | 230 kV | DUKE ENERGY CAROLINAS, LLC | IN SERVICE | 24.4 mi |
| #58180 | 230 kV | DUKE ENERGY CAROLINAS, LLC | IN SERVICE | 9.8 mi |
| #61561 | 230 kV | DUKE ENERGY CAROLINAS, LLC | IN SERVICE | 30.2 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of RIPP SWITCHING STATION, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| UNKNOWN111199 | Substation-Adjacent | NC | Cleveland County | 500 kV | 1,000 MW | 3.7 yrs | 79.9 |
| JAMES E. ROGERS ENERGY COMPLEX | Substation-Adjacent | NC | Cleveland County | 500 kV | 1,000 MW | 3.7 yrs | 77.6 |
| PACOLET TIE | Substation-Adjacent | SC | Cherokee County | 230 kV | 300 MW | 3.7 yrs | 74.7 |
| CLEVELAND CNTY GENERATING FACILITY | Substation-Adjacent | SC | Cherokee County | 230 kV | 300 MW | 4.3 yrs | 74.3 |
| SHELBY TIE | Substation-Adjacent | NC | Cleveland County | 230 kV | 300 MW | 3.7 yrs | 73.9 |
| Greenfield (UNKNOWN111199 - MCGUIRE) | Greenfield | NC | Gaston County | 500 kV | 1,000 MW | 3.7 yrs | 73.5 |
| Greenfield (UNKNOWN111199 - MCGUIRE) | Greenfield | NC | Gaston County | 500 kV | 1,000 MW | 3.7 yrs | 73.0 |
| James E. Rogers Energy Complex | Brownfield | NC | Rutherford | — | 1,010 MW | — | 71.9 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for RIPP SWITCHING STATION substation, North Carolina. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.