Max voltage
100
kV

OXFORD DAM is an electric transmission substation in North Carolina. It is classified as distribution (69–115 kv) and connects 5 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage100 kV
Min voltage100 kV
Voltage classDistribution (69–115 kV)
Connected lines5

Ownership & operation

Operator not catalogued for this substation.

Coordinates35.8319, -81.1143

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#1613100 kVIN SERVICE9.9 mi
#6524100 kV0.0 mi
#7691100 kVIN SERVICE13.6 mi
#56777100 kVIN SERVICE4.3 mi
#56801100 kVIN SERVICE7.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of OXFORD DAM, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near OXFORD DAM substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
ANTIOCHSubstation-AdjacentNCWilkes County500 kV1,000 MW3.1 yrs72.0
LONGVIEWSubstation-AdjacentNCCatawba County230 kV300 MW3.7 yrs71.3
Greenfield (WOODLEAF SWITCHING STATION - M)GreenfieldNCRowan County500 kV1,000 MW4.3 yrs69.6
LONGVIEWSubstation-AdjacentNCCatawba County230 kV300 MW4.3 yrs68.9
MARSHALL STEAM STATIONSubstation-AdjacentNCCatawba County230 kV300 MW4.3 yrs68.3
MCGUIRESubstation-AdjacentNCLincoln County500 kV1,000 MW4.3 yrs66.3
ANTIOCHSubstation-AdjacentNCAlexander County500 kV1,000 MW4.3 yrs66.2
UNKNOWN114464Substation-AdjacentNCMecklenburg County100 kV50 MW4.3 yrs66.1

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.