NORTH GREENVILLE TIE

Substation

North Carolina · DUKE ENERGY CAROLINAS, LLC

Max voltage
230
kV

NORTH GREENVILLE TIE is an electric transmission substation in North Carolina, operated by DUKE ENERGY CAROLINAS, LLC. It is classified as high-voltage (230 kv) and connects 18 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage100 kV
Voltage classHigh-voltage (230 kV)
Connected lines18

Ownership & operation

OperatorDUKE ENERGY CAROLINAS, LLC
Coordinates34.8754, -82.4657

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#7356230 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE29.3 mi
#37597230 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE18.4 mi
#6581230 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE8.4 mi
#23130230 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE29.3 mi
#49500230 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE8.4 mi
#27782230 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE18.4 mi
#20795100 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE2.8 mi
#21802100 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE2.3 mi
#35464100 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE1.1 mi
#40256100 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE2.2 mi
#43947100 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE1.8 mi
#65100 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE1.8 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of NORTH GREENVILLE TIE, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near NORTH GREENVILLE TIE substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
TIGER TIESubstation-AdjacentSCSpartanburg County230 kV300 MW3.7 yrs75.4
NORTH GREENVILLE TIESubstation-AdjacentSCGreenville County230 kV300 MW3.7 yrs72.3
Greenfield (UNKNOWN111199 - JOCASSEE TIE)GreenfieldSCGreenville County500 kV1,000 MW3.7 yrs69.8
Greenfield (UNKNOWN111199 - JOCASSEE TIE)GreenfieldSCPickens County500 kV1,000 MW3.7 yrs69.7
Greenfield (UNKNOWN111199 - JOCASSEE TIE)GreenfieldNCPolk County500 kV1,000 MW3.7 yrs69.1
SHILOH SWITCHING STATIONSubstation-AdjacentSCPickens County230 kV300 MW3.7 yrs69.0
UNKNOWN170138Substation-AdjacentSCGreenville County100 kV50 MW3.7 yrs68.6
SHADY GROVESubstation-AdjacentSCGreenville County230 kV300 MW4.3 yrs68.2

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for NORTH GREENVILLE TIE substation, North Carolina. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.