MOREHEAD WILDWOOD

Substation

North Carolina · PROGRESS ENERGY CAROLINAS INC

Max voltage
230
kV

MOREHEAD WILDWOOD is an electric transmission substation in North Carolina, operated by PROGRESS ENERGY CAROLINAS INC. It is classified as high-voltage (230 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage115 kV
Voltage classHigh-voltage (230 kV)
Connected lines3

Ownership & operation

OperatorPROGRESS ENERGY CAROLINAS INC
Coordinates34.8035, -76.8505

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#4962230 kVPROGRESS ENERGY CAROLINAS INCIN SERVICE15.4 mi
#24320115 kVPROGRESS ENERGY CAROLINAS INCIN SERVICE3.4 mi
#49395115 kVPROGRESS ENERGY CAROLINAS INCIN SERVICE0.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of MOREHEAD WILDWOOD, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near MOREHEAD WILDWOOD substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
TAP148456Substation-AdjacentNCCraven County230 kV300 MW4.3 yrs65.2
UNKNOWN111441Substation-AdjacentNCCraven County230 kV300 MW4.3 yrs64.1
UNKNOWN111646Substation-AdjacentNCCraven County230 kV300 MW4.3 yrs63.8
TAP148417Substation-AdjacentNCOnslow County230 kV300 MW4.3 yrs63.2
TAP148457Substation-AdjacentNCCraven County230 kV300 MW4.3 yrs63.0
MOREHEAD WILDWOODSubstation-AdjacentNCCarteret County230 kV300 MW4.3 yrs62.9
UNKNOWN111638Substation-AdjacentNCJones County230 kV300 MW4.3 yrs62.4
TAP148412Substation-AdjacentNCCraven County230 kV300 MW4.3 yrs61.4

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for MOREHEAD WILDWOOD substation, North Carolina. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.