MOREHEAD WILDWOOD
SubstationNorth Carolina · PROGRESS ENERGY CAROLINAS INC
MOREHEAD WILDWOOD is an electric transmission substation in North Carolina, operated by PROGRESS ENERGY CAROLINAS INC. It is classified as high-voltage (230 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Ownership & operation
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #4962 | 230 kV | PROGRESS ENERGY CAROLINAS INC | IN SERVICE | 15.4 mi |
| #24320 | 115 kV | PROGRESS ENERGY CAROLINAS INC | IN SERVICE | 3.4 mi |
| #49395 | 115 kV | PROGRESS ENERGY CAROLINAS INC | IN SERVICE | 0.1 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of MOREHEAD WILDWOOD, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| TAP148456 | Substation-Adjacent | NC | Craven County | 230 kV | 300 MW | 4.3 yrs | 65.2 |
| UNKNOWN111441 | Substation-Adjacent | NC | Craven County | 230 kV | 300 MW | 4.3 yrs | 64.1 |
| UNKNOWN111646 | Substation-Adjacent | NC | Craven County | 230 kV | 300 MW | 4.3 yrs | 63.8 |
| TAP148417 | Substation-Adjacent | NC | Onslow County | 230 kV | 300 MW | 4.3 yrs | 63.2 |
| TAP148457 | Substation-Adjacent | NC | Craven County | 230 kV | 300 MW | 4.3 yrs | 63.0 |
| MOREHEAD WILDWOOD | Substation-Adjacent | NC | Carteret County | 230 kV | 300 MW | 4.3 yrs | 62.9 |
| UNKNOWN111638 | Substation-Adjacent | NC | Jones County | 230 kV | 300 MW | 4.3 yrs | 62.4 |
| TAP148412 | Substation-Adjacent | NC | Craven County | 230 kV | 300 MW | 4.3 yrs | 61.4 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.