MCADENVILLE

Substation

North Carolina · DUKE ENERGY CAROLINAS, LLC

Max voltage
100
kV

MCADENVILLE is an electric transmission substation in North Carolina, operated by DUKE ENERGY CAROLINAS, LLC. It is classified as distribution (69–115 kv) and connects 13 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage100 kV
Min voltage100 kV
Voltage classDistribution (69–115 kV)
Connected lines13

Ownership & operation

OperatorDUKE ENERGY CAROLINAS, LLC
Coordinates35.2677, -81.1022

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#1539100 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE1.8 mi
#24907100 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE3.6 mi
#37844100 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE3.4 mi
#49846100 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE3.5 mi
#57317100 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE2.1 mi
#57318100 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE2.1 mi
#57331100 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE4.0 mi
#57332100 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE4.1 mi
#64869100 kVDUKE ENERGY CAROLINAS, LLC5.9 mi
#65233100 kVDUKE ENERGY CAROLINAS, LLC6.3 mi
#65234100 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE3.4 mi
#65235100 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE4.8 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of MCADENVILLE, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near MCADENVILLE substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
MCGUIRESubstation-AdjacentNCMecklenburg County500 kV1,000 MW3.7 yrs81.1
CLEVELAND CNTY GENERATING FACILITYSubstation-AdjacentSCCherokee County230 kV300 MW4.3 yrs74.3
Greenfield (UNKNOWN111199 - MCGUIRE)GreenfieldNCGaston County500 kV1,000 MW3.7 yrs73.5
Greenfield (UNKNOWN111199 - MCGUIRE)GreenfieldNCGaston County500 kV1,000 MW3.7 yrs73.0
UNKNOWN114646Substation-AdjacentNCMecklenburg County230 kV300 MW4.3 yrs72.4
WOODLAWNSubstation-AdjacentNCMecklenburg County230 kV300 MW4.3 yrs72.3
TAP169820Substation-AdjacentNCMecklenburg County230 kV300 MW4.3 yrs71.4
CATAWBA 230KV SWITCHING STATIONSubstation-AdjacentSCYork County230 kV300 MW4.3 yrs71.3

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for MCADENVILLE substation, North Carolina. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.