MAYO

Substation

North Carolina

Max voltage
500
kV

MAYO is an electric transmission substation in North Carolina. It is classified as extra-high-voltage (500 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage500 kV
Min voltage500 kV
Voltage classExtra-high-voltage (500 kV)
Connected lines3

Ownership & operation

Operator not catalogued for this substation.

Coordinates36.3336, -78.8426

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#4161500 kVIN SERVICE10.3 mi
#23882500 kV0.3 mi
#43337500 kVIN SERVICE45.7 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of MAYO, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near MAYO substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN115116Substation-AdjacentNCDurham County230 kV300 MW4.3 yrs71.4
MAYOSubstation-AdjacentNCPerson County500 kV1,000 MW4.3 yrs70.5
PERSONSubstation-AdjacentNCPerson County500 kV1,000 MW4.3 yrs70.2
TAP147996Substation-AdjacentVAMecklenburg County115 kV100 MW3.1 yrs69.9
ENOSubstation-AdjacentNCOrange County230 kV300 MW4.3 yrs69.9
TAP147395Substation-AdjacentNCDurham County230 kV300 MW4.3 yrs68.1
Greenfield (DURHAM - WAKE)GreenfieldNCDurham County500 kV1,000 MW4.3 yrs68.1
UNKNOWN112012Substation-AdjacentNCGranville County230 kV300 MW4.3 yrs67.9

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for MAYO substation, North Carolina. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.