LEE

Substation

North Carolina · DUKE ENERGY CAROLINAS, LLC

Max voltage
230
kV

LEE is an electric transmission substation in North Carolina, operated by DUKE ENERGY CAROLINAS, LLC. It is classified as high-voltage (230 kv) and connects 33 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage100 kV
Voltage classHigh-voltage (230 kV)
Connected lines33

Ownership & operation

OperatorDUKE ENERGY CAROLINAS, LLC
Co-ownerDUKE ENERGY PROGRESS - (NC)
Co-ownerPROGRESS ENERGY CAROLINAS INC
Coordinates34.9856, -80.3453

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#57958230 kVPROGRESS ENERGY CAROLINAS INCIN SERVICE13.9 mi
#57598230 kVDUKE ENERGY PROGRESS - (NC)IN SERVICE16.8 mi
#57949230 kVDUKE ENERGY PROGRESS - (NC)IN SERVICE16.2 mi
#32574230 kVPROGRESS ENERGY CAROLINAS INCIN SERVICE5.8 mi
#53301230 kVPROGRESS ENERGY CAROLINAS INCIN SERVICE9.5 mi
#42281230 kVPROGRESS ENERGY CAROLINAS INC0.5 mi
#24939230 kVPROGRESS ENERGY CAROLINAS INC0.9 mi
#24402115 kVPROGRESS ENERGY CAROLINAS INCIN SERVICE9.2 mi
#49143115 kVPROGRESS ENERGY CAROLINAS INC0.7 mi
#41894115 kVDUKE ENERGY PROGRESS - (NC)IN SERVICE0.4 mi
#33612115 kVPROGRESS ENERGY CAROLINAS INC0.7 mi
#25031115 kVPROGRESS ENERGY CAROLINAS INCIN SERVICE0.4 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of LEE, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near LEE substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
TAP154118Substation-AdjacentNCUnion County230 kV300 MW4.3 yrs70.0
UNKNOWN114587Substation-AdjacentNCUnion County230 kV300 MW4.3 yrs69.8
HARRISBURGSubstation-AdjacentNCMecklenburg County230 kV300 MW4.3 yrs69.7
UNKNOWN114250Substation-AdjacentNCMecklenburg County100 kV50 MW4.3 yrs65.7
TAP154125Substation-AdjacentNCMecklenburg County100 kV50 MW4.3 yrs65.2
Greenfield (UNKNOWN114385 - NEWPORT TIE)GreenfieldNCUnion County500 kV1,000 MW4.3 yrs65.2
Greenfield (UNKNOWN114385 - NEWPORT TIE)GreenfieldNCAnson County500 kV1,000 MW4.3 yrs65.0
Greenfield (UNKNOWN114253 - HARRISBURG)GreenfieldNCMecklenburg County230 kV300 MW4.3 yrs64.8

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for LEE substation, North Carolina. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.